MISSION CRITICAL
Ragingwire CA3
Architect-of-Record | Design Architect | Design Director
Ragingwire Data Centers
180,000 sf total: 68,000 sf Data Floor Space
14 MW total IT load: 4 -3.5MG Vaults
$100m Construction Cost
North Natomas, Sacramento, CA
Third California Data Center for Ragingwire (now NTT DATA) incorporating design elements and amenities developed in the VA1 facility in Ashburn, VA. The design incorporates a shared electrical room, split mechanical rooms and shared generator and cooling tower yard supporting 4 Data room Vaults, to allow for easy phased build-outs. Includes new dedicated 69KV substation. Facility provides generous client amenities, office space and storage arranged to support Sales Tours and client engagement.
Managed internal and external A&E teams, coordinated with internal construction team, worked closely with Sacramento County Business Development, Planning, Building and Air Quality officials to expedite all permitting.
Ragingwire VA1
Design Architect | Project Manager | Project Architect
Ragingwire Data Centers
140,000 sf total: 69,000 sf Data Floor Space
12.6 MW total IT load: 5 -2.1-3.6MG Vaults
$80m Construction Cost
“Data Center Alley”, Ashburn, VA
First Virginia Data Center for Ragingwire (now NTT DATA) incorporating design elements and amenities developed to attract new customers in a highly competitive new market. Facility provides generous client amenities, office space and storage arranged to support Sales Tours and client engagement. The design incorporates a split electrical room, mechanical rooms and generator and cooling tower yards to modulate investment in this phased build-out, supporting 5 Data room Vaults.
Managed external A&E teams, coordinated with internal construction team, worked closely with company executive to meet design and schedule goals.
Ragingwire VA-Greenfield Masterplan
Design Architect | Design Director
Ragingwire Data Centers
78 acre -5 Data Center Campus
2m sf
“Data Center Alley”, Ashburn, VA
Managed contract execution of a $20m land acquisition including negotiating with County and School District representatives; Led Master Planning, negotiated and planned new substation with Dominion Energy and secured entitlements on a new 78 acre, 5 building, 2,000,000 sf Data Center Campus in Ashburn VA
Masterplan goal sought to maximize potential Data Floor Space on site, incorporating a new dedicated substation while maintaining existing wetlands and emergency access for the adjacent school.
Client facing functions and offices are position at the public edges while operational functions; electrical, mechanical and generator yards are position toward the interior forming a shared “service” street running through the center off the campus.
Ragingwire VA-Greenfield Building 1
Design Architect | Design Director
Ragingwire Data Centers
300,000 sf attached Data Center, 130,000 sf Data Floor Space
125,000 sf Conference Center, Client support & Class A office
1 of 5 buildings on 78 ace Campus
“Data Center Alley”, Ashburn, VA
Concept design for first data center build on new 78 acre campus. Two floor 300,000 sf Data Center with 8 vaults totally 130,000 sf. Leasable Class A office space is developed as an adjacent and connected amenity along with typical Ragingwire Client amenities. At the far edge of the facility is planned a 28,000 sf fabrication shop and construction offices to service the long range build-out of the campus.
Visually connected to the main entrance, a conference center, lecture hall, commercial kitchen with inside and outside dining is also planned to make this first build a central hub and gather place for the Campus community.